Daka Biodiesel plant. C.F. Møller. Photo: Julian Weyer

Daka Biodiesel plant

Daka Biodiesel is building a new production plant for biodiesel manufacture, located at Daka’s existing production facilities in Løsning, south of Horsens.
 Daka Biodiesel plant. C.F. Møller. Photo: Mads Møller
Facts

Client

DAKA Bio-industries

Address

Løsning, Denmark

Size

1,900 m² plus 2600 m² tank enclosure

Year

2006-2008

Construction

K.G. Hansen

Engineering

Rambøll

Architect

C.F. Møller Architects

Landscape

C.F. Møller Architects

Collaborators, other

Biodiesel International (Austria)

The plant consists of four parts: a production building, a distillation tower, a service building and a tank enclosure. The four parts are linked by a common structure which contains a pipe bridge and safety walkways. The production-related buildings are equipped with surfaces of cement and steel plate in various shades of grey, while the service building is in a warm yellow-orange colour. The facade on the motorway side is equipped with large glass panels which provide a view of the technical equipment, including the distillation tower, which is the tallest building at the plant.

Read more

More projects | Industrial

Go to Projects

Contact

Feel free to contact us for more information or business inquiries.